RiverOak Strategic Partners
Airspace Procedures
In 2019, RiverOak Strategic Partners (RSP) began the process to secure approval from the Civil Aviation Authority (CAA) for its use of airspace and procedures to enable safe and efficient operations to and from the airport.
The process is defined in the Civil Aviation Publication (CAP) 1616 – Airspace Design: Guidance on the regulatory process for changing airspace design including community engagement requirements.
The Civil Aviation Authority CAP 1616 process for airspace change is carried out in 7 stages, with 14 very precise steps. It also includes four process ‘gateways’ beyond which you are not allowed to proceed until approved by the CAA. We are working methodically through the process, and we are Now at Stage 3.
In Stage 2 we sought feedback for our Design Options, from air navigation service providers at neighbouring airports, the wider aviation community and selected representatives of local communities such as members of local authorities, parish councils and MPs representing constituencies in the surrounding area to ensure any critical technical and operational interdependencies were considered.
In reaching Stage 3, the CAA has confirmed that it is satisfied the airspace change proposal, up to this stage, is in accordance with the CAA’s Airspace Modernisation Strategy and UK Masterplan. The design options will now be subject to a comprehensive public consultation. The public consultation will comprise 4 specific steps and a Consult Gateway during Stage 3. This is a key part of the airspace change process where we will take into account the wider views of residents, businesses, communities, the public and other stakeholders.
To access the Manston page on the CAA’s dedicated Airspace Change portal, please click here.
On the CAA portal, if you slide the green buttons to the right, you will reveal the earlier stages and, at the bottom of these sections, you will find copies of uploaded documents.
The Airspace Change Process
The process is set out in this diagram:
FAQ
What is airspace?
Airspace is the ‘invisible infrastructure’ in the sky which helps aircraft operate safely. It is an essential part of the UK’s national transport infrastructure.
What is airspace change and why is it necessary?
The UK’s airspace and its structure were designed more than 50 years ago and needs to be modernised to make best use of the improvements in aircraft technology since that time. This has the potential to improve flight punctuality, reduce noise and make aviation more sustainable. As part of the Government’s Airspace Modernisation Strategy (AMS), all UK airports are required to upgrade the airspace used by arriving and departing aircraft up to 7,000 feet. NATS, the air traffic services provider, will update the ‘en route’ network above this threshold. Airspace change is the process through which airspace modernisation will be delivered. It is overseen by the Civil Aviation Authority (CAA), the UK’s aviation regulator, following the guidance set out in its CAP1616 publication, and led by a change sponsor – usually an airport.
Is the airspace change process linked to RSP’s Development Consent Order (DCO)?
Airspace change is a separate process and one that all airports in the UK are required to undertake as part of a nationwide modernisation of our ‘infrastructure in the sky’. By establishing airspace and operating procedures for flights to and from Manston, this process will ensure that – if granted permission to reopen – the airport can operate in the safest, most efficient and sustainable way by fully utilising the improved navigational capabilities of modern aircraft and the updated ‘en route’ network.
Why did you begin this process before the DCO decision was made?
What stage is Manston Airport at in the airspace change process?
When can members of the public get involved?
Why are you engaging with airspace users first?
What is the timeline for airspace change?
Why doesn’t the process include flights over 7,000ft?
What is the role of the Civil Aviation Authority (CAA)?
Further information
To access the Manston page on the CAA’s dedicated Airspace Change portal, please click here.
On the CAA portal, if you slide the green buttons to the right you will reveal the earlier stages and, at the bottom of these sections, you will find copies of uploaded documents.
For information on how the process works, please see the Civil Aviation Publication (CAP) 1616 – Airspace Design: Guidance on the regulatory process for changing airspace design including community engagement requirements.
RiverOak Strategic Partners Limited
Registered Office
30 Orange Street
London WC2H 7HF
Registered in England and Wales.
Company Number: 10269461
Copyright © 2017-date
RiverOak Strategic Partners